April 22, 2016

It is well known that seismic companies have a long tradition for patenting their solutions and it has become a necessity for all players in the industry to navigate carefully in the development and use of seismic equipment.

The validity of patents will always be geographically limited – some very narrow and some wider. As a relative newcomer to the market for seabed seismic systems we fully respect IP secured through patents and have spent a significant amount of time and money navigating our way through the field of patents and patent applications.

In inApril we always try to stay clear of existing IP in our efforts to design cost efficient seabed solutions, but it is not always clear what will or will not infringe existing patents. Despite our best efforts there may be patents that we have overlooked in our searches and there may also be ‘prior art’ in the sector. As the case is for any equipment supplier, inApril can therefore not rule out that parts of our solutions could infringe other’s patents rights if used in certain countries.

inApril works under strict ethical standards and we will always inform our customers of what we know when it comes to other’s patents, but we can not control how and where our customers use inApril’s equipment and solutions. The responsibility will therefore always be with our customers to carry out their own evaluations and make their own decisions.

In our patent searches we have seen that some patent applications cover the most obvious solutions. To reduce the risk of anyone, intentionally or unknowingly, trying to patent parts of our Venator solution or ways of operating, we have decided to make public elements of our solutions that previously might not have been presented in a traceable way, although they have been disclosed in meetings with potential customers and end users.

Most of what is listed below will become an integrated part of our marketing material and other documentation. The list is not complete and more solutions will be added over time. It should be noted that some of the solutions we make public this way might be included in presently non-public inApril patent applications.

 

Venator solutions

 

The Nodes

The A3000 node is designed to meet the requirements for all types of nodal operations, whether for cable or ROV deployment. However, we also deliver nodes for special markets such as transition zones. Some of our nodes have electronics and sensors in separate pressure compartments.

 

Rope or Cable

Venator is currently designed for rope with a central core payload for the right buoyancy. However, replacing the node’s ‘rope latch’ mechanism may allow the use of other cables such as steel wire. Replacement can be carried out without the need to open up the node’s pressure compartments.

Venator does not use expensive rope termination joints – rope sections are joined together by means of conventional rope splices. This approach was taken because it adds no cost, is quicker to connect, provides a stronger solution and is more flexible in use.

 

Recording

The Venator nodes can operate in different recoding modes. These include:

  1. Recording starts as the onboard charging power is disconnected and continues until the charging power is connected again.
  2. Recording starts when the node has been steady on the seabed for a set time. The recording may also be programmed to stop again when the node detects that recovery has commenced.
  3. Recording starts after a fixed time from when the node has been deployed from the vessel. The recording may also be programmed to stop again when the node detects that recovery has commenced.

The nodes record and store an RMS value of all four channels at regular intervals in addition to an accumulated RMS. This is used for QC of the data in the data management system.

 

Data Management System

In addition to its normal task of taking care of the data from the nodes, the Venator data management system also performs the following tasks:

  1. Keeping track of locations and status of all nodes at all times.
  2. Selecting the sequence of nodes to be deployed and where the nodes shall be docked once recovered.
  3. Controlling the rope speed and node intervals/positions on the rope.

The Venator data management system is designed for ‘hands-free’ operations. The flow and processes are mostly automatic and the focus is on monitoring and QC.

 

Clock

Venator has all nodes connected with power, data communication and a clock synchronization signal at all times while onboard. This means that the clock will normally never be switched off, which again improves the stability of the clock significantly over time. The nodes do however have a ‘standby mode’ for longer storage (eg. onshore storage).

 

Docking

A standard Venator system has sufficient docking positions/slots for all nodes. The nodes can dock in any docking slot.

Venator uses a ‘crane’ to move nodes between docking slots. The ‘crane’ can carry two nodes at a time, is not linked to any carrier system and can only move nodes between different slots.

Dummy docking-slots are used for pick-up and delivery of the nodes. Nodes are pushed or pulled in or out of the dummy docking-slot(s). The ‘crane’ moves nodes between a dummy slot and a ‘real’ slot. The sequence can be to move nodes via dedicated slots for clock sync/drift and/or data downloading before being moved to a parking slot. The parking slots have power, data communication and a clock sync pulse.

 

Positioning Transponder

The built-in transponder can operate in different modes to extend the battery endurance. These modes are, but limited to:

  1. Always powered as long as the onboard external charging power is disconnected.
  2. Powered from when the onboard charging power is disconnected (deployment) and until it has been stable on the seabed for a set time. The transponder power in this mode will normally be programmed to come on again if the node experience movements (typically, but not necessarily, recovery).
  3. In combination with point two above there are options to preprogram the power to come on at certain times or under certain conditions while on the seabed.
  4. In mode two and three above the power will remain on for a set time after the last interrogation from the vessel.

 

 

December 3, 2015

The building of the major elements of the Venator’s Launch and Recovery System was completed 26th November (2 weeks delayed) and has since been thoroughly tested. The target speed was set to a continuous  3 knots with no stops during deployment or recovery. During the test the system was operated at up to 5 knots with no problems. We are very happy with this achievement, but equally important is that the design is simple and robust with few sensors and moving parts. The system will now be moved to another location near Oslo where potential contractor customers and end users will be invited for demonstrations from mid January.

 

on_off module

October 28, 2015

This years show had fewer visitors than previous years and the general mood was as expected, subdued.  But for the three of us that manned inApril’s booth, the exhibition was just another confirmation that we are doing the right things and that the timing is good for introducing a cost-efficient Ocean Bottom Node (OBN) solution. We had three busy days and experienced a strong interest from oil companies, potential customers, analysts and not the least, competitors.

There was a consensus amongst participants that there will be a growing demand for seabed seismic in the coming years, and that this growth will come from more use of cost-efficient OBN seismic systems as inApril has developed (Venator). The picture below is representative for how it was most of the time; busy with people learning more about Venator and watching the animations. A handful of potential customers expressed the desire to come to Norway to see the Launch and Recover System (LRM) demonstrated. This unit is being built and will be ready for internal testing in second half of November. Potential customers will be invited for a demonstration in January.

Based on the positive feedback from SEG we have decided to speed up the remaining test plans, which involves building 50 – 100 nodes to collect seismic data during next spring / summer.

 

SEG_New_Orleans

September 10, 2015

inApril has contracted to ProFocus Systems to develop Venator’s integrated Data Management and Operator Console system. The system will deliver post processed navigation data in near real-time.

“We are very satisfied with having ProFocus onboard in building Venator to become the complete and fully integrated system for ocean bottom node acquisition.  Their knowledge and competence in onboard seismic data management is unparalleled and will ensure a robust and top notch solution,” says Vidar Hovland, CEO of inApril.

 

ProFocus Systems

ProFocus is a software company based in Bergen, Norway, established 2001, developing Recording Software, Data Management Software, and Real Time Quality Control systems for the high-end marine seismic acquisition industry.  The company has installed Tape Management and Real Time Quality Control systems on nearly 60 seismic vessels world wide. Currently, Profocus has more than 20 vessels under support and maintenance contract. In addition to regular towed seismic operations, Profocus has developed several systems for 4-component seabed installations, including nodes, recoverable cables, and permanent reservoir monitoring.

September 1, 2015

inApril has over the summer secured additional financing to further the company´s development and test program. The test program includes:

– A node verification program. (ongoing)
– The manufacture and testing of full scale versions of the Launch and Recovery System (LRS),  including: (ongoing)
     a) the module that connects / disconnects the node to / from the rope at full speeds (>3 knots).
     b) the system that safely receive nodes during recovery at high speed and in any weather conditions.
– The manufacture and testing of components to the docking arrangements.

8th February 2015

Odd Erik joined InApril in February 2015, as CFO. He has 28 years experience from the shipping and offshore industry, 20 of these within the seismic sector. He has been Group Chief Accountant and Financial Controller in PGS, co-founder and CFO in Reservoir Exploration Technology ASA, and recently co-founder and CFO in Seafloor Geophysical Solutions AS.

8th December 2014

inApril is developing a system for deployment of ocean bottom nodes in deep water using our node-on-a-rope solution. This allows our customers to acquire ocean bottom seismic in deep water with efficiency that haven’t been seen to date.

For further information please contact us on ‘post@inapril.com’.

21st November 2014

We are happy to announce that Westcon Power & Automation and inApril have signed an agreement for development of the Venator’s advanced node-on-a-rope deployment and recovery system. This includes winches, rope traction control and over the stern / side system.

Westcon Power & Automation delivers advanced, tailor-made automation systems for the oil and gas industry from offices in Ølen, Karmøy and Stord. The company focuses on flexibility and highly qualified personnel and has over more than 20 years built up a strong market position.

30th October 2014

inApril is pleased to announce that we have been able to develop a Node with battery life of more than 100 days. This makes the Node suitable for all kind of node operations, also deep-water ROV node operations, which normally require the node to stay longer on the seabed.

For our customer this means they will be able to use the same node, same handling system and same vessel for all kind of operations, which again means less capex and better utilization of vessels and equipment.

For further information please contact us on ‘post@inapril.com’